Demand flexibility modelling for long term optimal distribution grid planning
Optimization tools for long-term grid planning considering flexibility resources require aggregated flexibility models that are not too computationally demanding or complex. Still, they should capture the operational benefits of flexibility sufficiently accurately for planning purposes. This paper investigates the sufficiency of an aggregated flexibility model for planning tools by comparing it against a detailed flexibility model. Two different constraint formulations, namely based on recovery period and temporal proximity were tested to account for post activation dynamics of flexibility resources. The results show that the recovery period based formulation results in excessive demand reduction. The proximity constraint formulation on the other hand results in realistic activation of flexibility resources which represents an improvement over the base formulation without constraints for post activation dynamics.
Funding
Advanced methodology and tools taking advantage of storage and FLEXibility in transmission and distribution grid PLANning
European Commission
Find out more...Centre for intelligent electricity distribution (CINELDI) - to empower the future smart grid
The Research Council of Norway
Find out more...History
Email Address of Submitting Author
iver.bakken.sperstad@sintef.noORCID of Submitting Author
0000-0002-4827-6431Submitting Author's Institution
SINTEF Energy ResearchSubmitting Author's Country
- Norway